Revision Table for EB-WI-0030 "Verify Requirements with a Procedure"
| ||||||||||||||||||||||||||||||||||||||||||||
|
EB-WI-0030, Rev A "Verify Requirements with a Procedure"
Personnel Performing this Process, by Named Role:
| ||||||||||||||||||||||||||||||||||||||||||||
|
"Verify Requirements with a Procedure" applies to Existing EBML-based process with requirements to add
![]() | ||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||
|
| ||||||||||||||||||||||||||||||||||||||||||||
|
Step 2.1: One line of EBML per verification
Verification | Requirement ID# | Full "shall" statement | Verification Method
Requirement ID#: from the source specification, just number sequentially if this doesn't exist
Full "shall" statement: the actual requirement wording
Verification Method: any of these:
- A - Analysis - I - Inspection - D - Demonstration - T - Test - S - Sampling Good explanation of each: NASA
| ||||||||||||||||||||||||||||||||||||||||||||
|
Step 3.2: Inspect the produced PDF
| ||||||||||||||||||||||||||||||||||||||||||||
|